NADU-NEDU 2 Guidelines for Material and Labour Charges Nadu Nedu Phase II
Sub: School Education dept - Mana Badi Nadu Nedu - Ceiling for the materials and Labour Charges for Phase - II - Issued - Regarding.
Ref: -
1. G.O.Ms No. 87 of the School Education (Prag-II) Department dated 30- 11-2019.
2. G.O Ms No 22 of the school education (Prog II) Department dated 06-05- 2020.
3. G.O.MS No. 27 of the School Education (Prag-II) Department dated 30.03.2021.
In the 1st Phase of Mana Badi Nadu Nedu , i t is learnt that the labourers and vendors have insisted to pay higher rates than local market price, citing reasons that it is Government work.In some places labor and vendors have formed as a pressure group and have demanded exorbitant rates.
In the community contract system it is expected that the Parent Committee members, HM, Local Engineer shall negotiate and bargain for less rates compared to market rates as it is a public work which is beneficial to students of the Village/Ward.
In this context, attention of all the District Educational Officers, Additional Project Coordinators and Executive Engineers of all the implementing agencies of Mana Badi Nadu Nedu Phase II, program in this State is invited to the references cited above and they are requested to follow the Suggested normal Market rates of Material and Labor Charges for Phase-II works which are to be executed by the Parents Committee through Community Contract system, so as to not give any scope for misuse of funds by Paying higher rates. In case of interior pockets, hilly terrains, the maximum permissible market rates may be adopted.
The parent committees shall explore market rates and negotiate even below normal rates. In any case permissible maximum rates cannot be exceeded . Hence, it is requested to adopt the suggested normal market rates of material and Labour charges as shown in the Annexure-I (for Material Rates) and Annexure-11 (for Labour Rates) enclosed.
If the Market Rates of Material and Labour Charges of a given Mandal are beyond Suggested Maximum Market rates given in Annexure I and II, then they shall be approved by District level tender committee headed by the Joint Collector constituted as per GO MS No 27 date 30.03.2021.
The Joint Collector (Development) shall ensure the proper assessment of prevailing market rates by constituting a subcommittee which will enquire in the market and asses before approving rates in the committee
2. G.O Ms No 22 of the school education (Prog II) Department dated 06-05- 2020.
3. G.O.MS No. 27 of the School Education (Prag-II) Department dated 30.03.2021.
In the 1st Phase of Mana Badi Nadu Nedu , i t is learnt that the labourers and vendors have insisted to pay higher rates than local market price, citing reasons that it is Government work.In some places labor and vendors have formed as a pressure group and have demanded exorbitant rates.
In the community contract system it is expected that the Parent Committee members, HM, Local Engineer shall negotiate and bargain for less rates compared to market rates as it is a public work which is beneficial to students of the Village/Ward.
In this context, attention of all the District Educational Officers, Additional Project Coordinators and Executive Engineers of all the implementing agencies of Mana Badi Nadu Nedu Phase II, program in this State is invited to the references cited above and they are requested to follow the Suggested normal Market rates of Material and Labor Charges for Phase-II works which are to be executed by the Parents Committee through Community Contract system, so as to not give any scope for misuse of funds by Paying higher rates. In case of interior pockets, hilly terrains, the maximum permissible market rates may be adopted.
The parent committees shall explore market rates and negotiate even below normal rates. In any case permissible maximum rates cannot be exceeded . Hence, it is requested to adopt the suggested normal market rates of material and Labour charges as shown in the Annexure-I (for Material Rates) and Annexure-11 (for Labour Rates) enclosed.
If the Market Rates of Material and Labour Charges of a given Mandal are beyond Suggested Maximum Market rates given in Annexure I and II, then they shall be approved by District level tender committee headed by the Joint Collector constituted as per GO MS No 27 date 30.03.2021.
The Joint Collector (Development) shall ensure the proper assessment of prevailing market rates by constituting a subcommittee which will enquire in the market and asses before approving rates in the committee
ANNEXURE-1 | ||||
SUGGESTED NORMAL/MAXIMUM MARKET RATES FOR MATERIALS (Including all taxes and excluding transportation) | ||||
s. No |
Name of the Material * (1 unit= 100cu ft) | Unit | Suggested normal Rates in Rs. | Suggested Maximum Rates in Rs |
1 | Gravel | 100 uft | 600 | 1000 |
2 | Stone Dust ( Path Ways and Basement Filling) | 100 tu ft | 1000 | 1100 |
3 | 12mm Crushed Granite | 100 u ft | 1200 | 1350 |
4 | 20mm Crushed Granite | 100 tuft | 2400 | 2600 |
5 | 40mm Crushed Granite | 100 tu ft | 1300 | 1500 |
Steel Rate s( ISi - FE -500 - KAMADHENU , SIMHADRI, ESSAR, SHREE TMT , TIRUMALA | ||||
6 | 8mm | KG | 67 | 69 |
7 | 10mm | KG | 65 | 68 |
8 | 12mm | KG | 65 | 68 |
9 | 16mm | KG | 65 | 68 |
10 | 20mm | KG | 65 | 68 |
11 | MS Iron GriUs and flats Including welding barges | 1 kg | 85 | 90 |
12 | MS Angles | 1 kg | 67 | 69 |
13 | MS Squares Including welding Charges | 1 kg | 65 | 68 |
14 | GI roofing Sheets (flat) size 1.00x3.00mts | 1 kg | 100 | 113 |
15 | Red Brick (including transportation) | 1 No. | 7 | 9 |
Flooring Materials | ||||
16 | Granite (Polished) any pattern.any size not less ban 2' on any side 18 mm thick | 1 Sft. | 60 | 90 |
17 | Rough Cuddapahblack slab ll "x23" 18mm hick | 1 Sft. | 18 | 22 |
18 | Polished Cuddapah black slab (only for Kadapa District)ll "x23" 18mm thick | 1 Sft. | 23 | 27 |
19 | Bethamcherla (Only for Kw1mool Dis trict) | 1 Sf t. | 20 | 25 |
20 | Tandur Polished stone size (23"x23")18mm hick | 1 Sft. | 28 | 32 |
ANNEXURE-11 | ||||
SUGG ESTED NORMAL/MAXIMUM RATES FOR LABOUR CHARGES | ||||
S.No | Name of the Material | Units | Suggested Normal Rates in Rs. |
Suggested Maximum Rates in Rs. |
1 | Dismantling of CC Flooring | 1 SIT | 10 | 12 |
2 | Dismantling of Rough/Polished Kadapa Flooring | l SIT | 10 | 12 |
3 | Dismantling of Wall Tiles in Toilets | 1 SIT | 8 | 9 |
4 | Dismantling of Flooring Tiles in Toilets/Rooms | 1 SFT | 8 | 10 |
5 | Earth Wark Excavationby Manual | lCFf | 20 | 25 |
6 | [Earth Work Excavation bymachinary (JCB) | Per Hour |
700 | 900 |
7 | K:onstruction of Toilets & ACRs (labour charges of all items. including rod bending, centering, mixing, K,ibrating,concreting, including architechtural element tc., finished item of work.) excluding material costs | |||
a | Ground floor | 1 SIT | 270 | 300 |
b | IFir st floor | 1 SIT | 220 | 240 |
C | Second floor | 1 SIT | 240 | 270 |
8 | wa ying of Wall Tiles in Toilet | 1 SIT | 14 | 16 |
9 | l aying of Floo ring Tiles in Class Rooms/ Toilet | 1 SFf | 14 | 15 |
10 | l aying of parking tiles | 1 SFI | 12 | 15 |
11 | laying of Granite in Class RoomN erandah | 1 SIT | 25 | 30 |
12 | laying of Granite @ Staircase | 1 SIT | 25 | 30 |
13 | laying of Rough/ Polished Black Slabs in Class [RoomNeranda | 1 SIT | 20 | 25 |
14 | Electrification Charges/ Each Room Including Groove utting and Verandha) |
lRoom | 2800 | 3200 |
15 | For Sanitary Fittings(l wash basin, 1 flush, 1 Water Closet including flush tank, Taps with pipe line) | 1 Toilet | ||
a | 1 Wash Basin | lNo | 700 | 800 |
b | 1 Water Closet Indian type including flush Tank | lNO | 800 | 1000 |
C | 1 Water Closet Westren type including flush Tank | lNO | 800 | 1000 |
d | 1 Urinal bowl | l NO | 400 | 500 |
16 | RCC Over Head Tank Labour Charges | lLtr | 7 | 9 |
17 | Over HeadTank Labour Charges (Rings based cast in Situ) |
lLtr | 5 | 7 |